MAK gradnja
Signalman – Assistant Locomotive Driver for Pile Driving
Applications for this job have closed.
About this role
Ensure precise placement and acceptance of steel sheet piles on site for proper installation. Coordinate with locomotive driver, monitor pile direction, position, and verticality for quality execution.
This is a preview. Read the complete description on the original listing.